Projects
- Aug 2026Every outdoor swimming pool in the Mostar municipality, found in satellite imagery by a two-stage detector: 1,998 mapped, grouped by settlement, and corrected against a hand-counted sample.
- Jul 2026A weekly-refreshed report on the Bosnia and Herzegovina power system — generation mix, load, and cross-border exchange with Croatia, Serbia, and Montenegro, tracked from ENTSO-E since 2015.
- Jul 2026Interactive digitization of the Džiho family tree from the book 'Porodica Džiho — porijeklo, ljudi i sjećanja' — 546 people across 8 generations and 5 branches.
- Jul 2026A live-data dashboard of the ERCOT grid — daily demand, the shifting fuel mix, and wind + solar's share of generation, tracked weekly since 2019.
- Apr 2026Reviewing how GNNs are being used to detect false data injection, locate cyber-physical attacks, and improve resilience in power systems.